How to read construction survey stakes

What it means

Stakes may show station, offset, cut or fill, grade reference and feature name. Hubs or nails may mark a precise reference point while lath identifies it.

What to check

Abbreviations, colors and reference elevations vary. Confirm the stake legend and approved plans with the survey crew before excavation. Protect control and request restaking when disturbed.

Worked example

STA 10+50 can mean 1,050 feet along an alignment; O/S 5 feet indicates an offset, but the side and reference line must be confirmed.

Further reading

Relevant professional or government resource

Related surveying guides

From surveying to construction

Excavation estimating · Construction calculators · Estimating plans and trial eligibility

Educational information only. Not a boundary determination, legal opinion, survey or construction authorization. Consult a licensed surveyor and appropriate design professionals.