The Sub's Dilemma
As a subcontractor, you're bidding the same work as 3–5 other subs on every project. The GC knows roughly what the work costs. You can't be dramatically higher — but racing to the bottom destroys your margin.
The answer isn't your price. It's everything else.
What GCs Actually Want From Subs
After the price, GCs rank their sub selection criteria as:
1. Reliability — will you show up on schedule?
2. Communication — will you respond quickly?
3. Quality — will the work pass inspection?
4. Documentation — clean scope, no surprises
Price is usually 4th or 5th on the list for GCs with good subs.
How to Format a Winning Sub Bid
Always submit a typed, formatted proposal — never a handwritten number on a sticky note.
Your bid should include:
Pricing Your Markup
Most subs target 15–25% gross margin depending on trade and market. Don't calculate markup as a percentage of cost — that's a common math error.
Correct: If cost is $10,000 and you want 20% margin: Price = $10,000 ÷ (1 - 0.20) = $12,500
Wrong: $10,000 × 1.20 = $12,000 (that's only 16.7% margin)