How Much Does It Cost to Remodel a Kitchen? 2026 Cost Breakdown
PRICING · 2026-06-02
A 2026 breakdown of kitchen remodel costs by tier, by trade, and by square foot — plus where the money actually goes and how to budget accurately.
A kitchen remodel in 2026 typically runs from about $15,000 for a modest refresh to $75,000 or more for a high-end full gut renovation, with most mid-range projects landing between $25,000 and $50,000. The final number depends on size, finish level, and whether you change the layout.
Kitchen remodel cost by tier
Budget refresh ($12,000–$20,000)
Paint, refinished or stock cabinets, laminate or butcher-block counters, a new sink and faucet, and basic appliances. Layout stays the same.
Mid-range remodel ($25,000–$50,000)
New semi-custom cabinets, quartz counters, tile backsplash, updated lighting and flooring, and mid-tier appliances. Minor layout tweaks.
High-end renovation ($60,000–$120,000+)
Custom cabinetry, stone counters, premium appliances, moved walls or plumbing, new windows, and designer finishes throughout.
Where the money goes
A typical mid-range budget breaks down roughly like this:
- Cabinets: 25–35%
- Labor (all trades): 20–35%
- Countertops: 10–15%
- Appliances: 10–15%
- Flooring: 5–10%
- Lighting and electrical: 5%
- Plumbing: 4–8%
- Paint, trim, and finishes: 5%
Cost per square foot
Kitchens are expensive per square foot because they pack in plumbing, electrical, cabinetry, and appliances. Expect roughly $150–$250 per square foot mid-range, and $300+ for high-end work.
What drives the price up
- Moving plumbing or gas lines
- Relocating or removing walls
- Custom vs. stock cabinetry
- Stone vs. laminate countertops
- Higher-end appliance packages
How to budget accurately
Don't start from a magazine photo — start from your actual room. Measure the space, list the scope by trade, and apply current local pricing. An estimating tool like Vega can use a floor plan as the basis for organizing quantities and costs into a structured estimate, helping you build a budget range before you call a contractor. Always add a 10–15% contingency for the surprises that hide behind old walls.