HOMEOWNER

The Homeowner's Guide to Getting a Renovation Estimate: What to Expect and How to Compare Bids

Vega Estimating Team·May 22, 2026

The "Get Three Bids" Rule Is Incomplete

Everyone tells homeowners to get three bids and pick the middle one. That advice is better than picking randomly — but it ignores the most important question: are these bids even comparing the same scope?

Two bids for the same kitchen remodel can vary by $40,000 not because one contractor is gouging you — but because they're literally bidding two different projects.

What Should Be in Every Bid

A complete contractor estimate should include:

  • Detailed scope of work — exactly what they're doing (not just "kitchen remodel")
  • Materials specified — brand, grade, or model number for major items
  • Labor breakdown — ideally by trade or phase
  • Exclusions — what is NOT included (critical!)
  • Timeline — start date and estimated completion
  • Payment schedule — milestones tied to work completed
  • License and insurance information
  • If a bid is a single number on a piece of paper — that's a red flag.

    How to Compare Bids Fairly

    Normalize the scope first. Make sure every bid includes the same work. Ask each contractor to confirm: does this include demo? Permits? Painting? Cleanup?

    Compare line items, not totals. A bid that breaks down materials and labor tells you much more than a lump sum.

    Check the exclusions. The "cheapest" bid often has a long exclusions list — which means change orders later.

    Ask about allowances. "Allowances" are placeholders for items not yet selected (tile, fixtures, cabinets). A bid with a $2,000 tile allowance may look cheap — until you pick tile and the allowance doubles.

    Red Flags in a Renovation Bid

  • No written contract
  • Requires more than 30% upfront payment
  • Unusually low bid (often means they'll make it up in change orders)
  • No license or insurance provided
  • No timeline specified
  • Pressure to sign immediately
  • Getting Your Own Estimate First

    One of the smartest things a homeowner can do before soliciting contractor bids is generate their own independent estimate using a tool like VegaEstimating.ai. When you upload your renovation plans and get an AI-generated estimate, you'll know the rough cost range going in — which means you can spot a lowball bid designed to win with change orders, or an inflated bid from a contractor who thinks you don't know any better.

    Knowledge is the best negotiating tool you have.