HOW-TO

Fireproofing Estimating: SFRM, Intumescent Coatings, Ratings, and Steel Conditions

Vega Team·October 6, 2026

Fireproofing is a scope where a simple square-foot price can hide important differences. The estimate needs to connect the rated assembly and protected members to the specified fire-resistive material, required thickness, access, preparation, and inspection requirements.

Start with the rating and system

Review life-safety drawings, structural schedules, specifications, and tested assembly references. Identify the required hourly rating and whether the design calls for spray-applied fire-resistive material, intumescent coating, or another listed system.

Quantify what is actually protected

For structural members, use beam and column schedules to organize member sizes and lengths, then determine the surface that receives protection. Deck protection should be measured separately when included.

Carry the installation conditions

  • Substrate preparation and compatibility
  • Masking and protection of adjacent finishes
  • Required material thickness
  • Difficult access, lifts, or scaffolding
  • Patching after other trades
  • Testing and inspection requirements
  • Mobilization for small or phased areas
  • Keep coatings separated

    Architectural paint, corrosion protection, specialty coatings, and intumescent fire protection are not interchangeable scopes. Follow the specification and clearly assign each system.

    Treat incomplete design as budgetary

    If ratings, member schedules, tested assemblies, or product requirements are missing, identify the estimate as preliminary. Fireproofing is tied to listed systems and design requirements, so apparent precision without those documents is not useful.

    Put the estimating workflow into practice

    Explore the Vega workflow related to this topic, or browse estimating tools by trade.

    Ready to Build Your Next Estimate?

    Upload a plan, review the takeoff, and build an estimate you can edit.