Utah boundary surveys: records, maps and filing
What it means
Understand what a Utah boundary survey map documents and where to request it.
What to check
Utah Code 17-73-504 governs filing of qualifying boundary survey maps. Older references to 17-23-17 reflect the former numbering. Check the current statute before relying on an older county instruction sheet.
Worked example
If you are planning a fence near a disputed line, request the existing survey map and deed before commissioning new work.
What to expect on a map
Look for orientation, scale, survey date, description, measured and record dimensions, monuments found and set, and the professional identification. Read the narrative alongside the drawing to understand how the surveyor reached the boundary conclusions.
Filing and access
The statute generally requires filing within 90 days after establishing or reestablishing a boundary line. Request a copy through the county surveyor or designated office. A subdivision plat, deed and survey map serve different purposes.
Before construction
Ask whether the survey covers the particular line in question. Confirm local permits and setbacks independently. A survey does not by itself authorize demolition, grading or fence relocation.
Questions for your surveyor
Ask which controlling evidence was recovered, what discrepancies were found, whether additional research is needed and what deliverables are included. For a disputed line, obtain legal advice before taking irreversible action.
Further reading
Continue learning: Utah surveying and public records
From surveying to construction
Excavation estimating · Construction calculators · Estimating plans and trial eligibility
Educational information only. Not a boundary determination, legal opinion, survey or construction authorization. Consult a licensed surveyor and appropriate design professionals.