Utah boundary surveys: records, maps and filing

What it means

Understand what a Utah boundary survey map documents and where to request it.

What to check

Utah Code 17-73-504 governs filing of qualifying boundary survey maps. Older references to 17-23-17 reflect the former numbering. Check the current statute before relying on an older county instruction sheet.

Worked example

If you are planning a fence near a disputed line, request the existing survey map and deed before commissioning new work.

What to expect on a map

Look for orientation, scale, survey date, description, measured and record dimensions, monuments found and set, and the professional identification. Read the narrative alongside the drawing to understand how the surveyor reached the boundary conclusions.

Filing and access

The statute generally requires filing within 90 days after establishing or reestablishing a boundary line. Request a copy through the county surveyor or designated office. A subdivision plat, deed and survey map serve different purposes.

Before construction

Ask whether the survey covers the particular line in question. Confirm local permits and setbacks independently. A survey does not by itself authorize demolition, grading or fence relocation.

Questions for your surveyor

Ask which controlling evidence was recovered, what discrepancies were found, whether additional research is needed and what deliverables are included. For a disputed line, obtain legal advice before taking irreversible action.

Further reading

Relevant professional or government resource

Continue learning: Utah surveying and public records

Browse all surveying topics

From surveying to construction

Excavation estimating · Construction calculators · Estimating plans and trial eligibility

Educational information only. Not a boundary determination, legal opinion, survey or construction authorization. Consult a licensed surveyor and appropriate design professionals.